Battery

Large-scale energy storage

  • Neumuenster, Germany
  • January 2024
Neumuenster, Germany

Battery storage for ancillary services

Altenso was contracted with the detailed engineering, construction, and commissioning of this 26 MW battery storage plant. It will mainly be used for ancillary services in the energy market. The construction phase started in May 2023 and was finished in September 2023. The plant was commissioned and connected to the medium voltage grid of Schleswig-Holstein in January 2024.

Project Figures

  • Power

    26 MW

  • Battery Capacity

    26.8 MWh

  • Role

    EPC set up

  • Components

    8 x SCS 3800
    8 x MVPS 440-S2

  • Monitoring

    SMA Power Plant Manager
    Hybrid Controller

  • Application

    Ancillary Services

SMA System Technology

Our power conversion units and battery containers are manufactured in a serial mass production in Kassel (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.

  • 20 foot Medium Voltage Power Station (MVPS)

    containing SMA Sunny Central Storage inverter technology

  • SMA Power Plant Manager with Hybrid Controller

    Innovative monitoring and controll systems