Mining Electrification

PV-Diesel + battery hybrid plant

  • Northern Goldfields, Australia
  • February 2023
Northern Goldfields, Australia

Hybrid PV-Diesel + battery plant

The project includes a 27.4 MW solar farm, another 10.7 MW  solar farm, a 11.2 MW / 5.4 MWh Leinster BESS, and interconnecting transmission infrastructure. The system solutions save over 540,000 tonnes of CO2, powering the two nickel mines from BHP.

Project Figures

  • Power

    38.2 MW

  • Components

    4 x SCS 2900 / 10 x SC 4200 UP

  • Monitoring

    SMA Power Plant Controller

  • Battery capacity

    5.4 MWh

  • Role

    Integrator

  • Application

    Mining Electrification

SMA System Technology

Our system solutions are manufactured in a serial mass production in Niestetal (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.

  • 20 foot container with one coverter unit

    MVPS 440-S2 with a Sunny Central Storage 3800

Explore more projects

Go back to our reference overview

Submit project proposals

Submit your project proposal through our contact form. With just a few clicks, you can send us your ideas in a straightforward and efficient manner.