Frequency regulation Pelham, UK 2017
The main application of the project is the capacity market and frequency response services but also features other applications like Triads management and reactive power provision.
This project is the largest battery project in the European Union in a single location till date.
The complete project timeline from contract signature till commissioning was reached within 5,5 months.
Project information
Installed battery power: 64 MVA
Installed battery storage: 50 MWh of Li-Ion NMC batteries for frequency regulation
Batteries installed in customized containers
Connected at 132 kV
SMA System Technology
26 SMA Sunny Central Storage 2475 with noise reduction packages
26 Medium Voltage Block 2475
7 Customized SMA E-houses
SMA Power Plant Controller
EMS